SITCOMTN-074: LATISS Warm-up and Cool-down Procedure

  • Alysha Shugart

Latest Revision: 2023-06-18

1 Overview

This document describes the procedure to pump and cool down LATISS from ambient pressure to its operational temperatures. It also outlines how to perform a controlled warm-up in the case of servicing or programmed power cuts.

2 Pumping LATISS to vacuum

Under atypical circumstances, LATISS needs to be warmed up to ambient temperature. Large periods of power outage, severe earthquakes (and different levels of intervention based on severity), or technical intervention may have necessitated warm-up. Pumping down, cooling, and powering up LATISS takes at least two days, and must be organized by ticket on the summit calendar and supported by daytime engineering support. Mario Rivera, Craig Lage, and Alysha Shugart are points of contact for understanding and initiating the procedure.

2.1 Getting started

AuxTel must be under LOTO and the E-STOP must be engaged to perform this operation. The safety team is responsible for the the approval of the LOTO procedure, which will be linked on this page once it is affirmed.

Start by powering up the instruments required to support the LATISS cooldown, located in the first floor cabinet.

Important

The instruments can be damaged by prematurely powering on the polycold system. Extreme caution must be exercised to ensure that everything is ready before starting to cool.

It is important to make sure that the electronics are turned on but the outputs are disabled, so no control loops are operating on LATISS until it’s under vacuum. These electronics to be powered on consist of:

  • 3 HMP2030 power supplies (powered by rocker switch in the back of the PDU in the cabinet)

  • 1 Keithley 6487 Voltage Source (rocker switch on the back of the device)

  • 1 Advantech Uno-1483G-434AE rail controller (HCU for ATCamera, reports and publishes sensor values)

  • 1 Cryocon temperature controller (for CCD sensor)

Power supply picoammeter

Figure 1 HMP2030 Power Supply (left) and Keithley 6487 Voltage source (right).

Rail and cryocon controller

Figure 2 Advantech Rail controller (left) and Cryocon Temperature controller (right).

2.2 Setting up the turbo (vacuum) pump

The CCD needs to work in a good vacuum (~10−7 Torr). For reaching this vacuum, there are two devices involved:

  • Pfeifer Turbopump (to be used from 1 Torr to ~10−6 Torr), complete with vacuum hose, pressure sensor and the sensor’s electronic display

  • Ion pump (to be used from 10−6 Torr onwards)

Turbo pump equipment

Figure 3 Pfeifer turbopump and accessories.

The Pfeifer turbopump lives in the AuxTel storage container on Calibration Hill. The turbo pump, vacuum hose, power supplies, and pressure sensor are stored together on the floor and first shelf of the storage container in a labeled cardboard box. The key to the storage container is found in the key box on the second floor (control room floor) of the main building, to the right of the main entrance doors. Mario Rivera also has a copy.

Auxtel Storage

Figure 4 Turbo pump supplies located in the storage unit outside of the AuxTel dome.

The ion pump (mounted on LATISS) doesn’t have enough capacity to evacuate the dewar from normal atmospheric pressure to working pressure, so the Pfeifer Turbopump has to be used first. The ion pump should be started only after ~10−6 Torr is reached (as operating the ion pump at higher pressures significantly decreases its lifespan).

2.3 Connect the turbopump to the dewar

Put the turbopump in a stable position close enough to the dewar position (to be close to the flange connections). An example setup is shown in Figure 5.

Warning

The Pfeifer Turbopump must be supported on a stable surface and strapped to the observing deck grating to ensure its safety in the case of an earthquake. The turbopump’s operation is degraded if it is not operating on a secure surface. A stout stool can be found on the observing floor of AuxTel which is perfect for this setup. It is likely that the instrument will need to be rotated to +20 degrees to accommodate this. The telescope mount may also need to be rotated to accommodate all of the power supplies necessary to run the turbopump and vacuum sensors.

Turbopump setup

Figure 5 Left - Connecting the turbopump to the dewar. Right - Vacuum hose connection to the dewar.

Remove the vacuum covers, and clean the turbopump and the hose flange with isopropyl alcohol and kimwipes (while wearing latex gloves), to avoid introducing contaminants inside the turbopump and hose. Store any unused vacuum connections on top of kimwipes in a clean location in the AuxTel dome. Connect the hose to the turbopump flange. The hose has to be in a relaxed shape, with no turn or folds.

After checking the instrument dewar valve is closed, clean both the vacuum hose and instrument dewar flange with alcohol. Connect the other end of the hose to the dewar, without forcing the hose into a stressed position. This is why it may be necessary to rotate Nasmyth #2 between 0° and 20° to find a comfortable fit.

Check the turbopump output valve is closed.

LATISS dewar valve

Figure 6 Picture of the LATISS dewar valve.

Note

The turbopump output valve is a vent that has to be closed. It is a black thumbscrew located on the pipe that enters the red vacuum sensor box. What is important is that the pressure in the vacuum line IS LOWER than the pressure of the dewar BEFORE EVER opening the dewar valve.

2.4 Starting the turbopump

Connect the external pressure sensor to the turbopump. This is an external sensor that is mounted on the top of the turbopump, and connects to an electronic display. See figure 7. This pressure sensor is identical to the dewar pressure sensor on the first floor. To start the electronic display read out, press and hold the up arrow key for three seconds.

Turbopump pressure sensor

Figure 7 Left – Turbopump vacuum line sensor (connected to the top of the pump). Right – Pressure electronic display.

Note

The setup in the left photo of Fig. 7 is example only. DO NOT operate the Turbopump on a non-rigid surface.

Connect the turbopump to a secure electrical outlet, and turn the rocker switch (at the back of the device on the lower right) to turn the pump on. This only puts the pump in operational condition, it’s not evacuating air yet.

Start the pump (with the front power button). The turbopump will spin up to 1500 Hz in full operation.

Operational turbopump

Figure 8 Turbopump is fully spun-up.

Before opening the instrument dewar valve, it’s necessary to have similar vacuums on the pump and inside the dewar. If this is not the case, the turbopump or the dewar inside LATISS could receive a high pressure shock. Ideally, you should wait until the pressure is lower on the turbopump’s side.

  • If the dewar has been warmed up and opened or vented, it may be at atmospheric pressure or under a slight positive pressure if purged with dry nitrogen.

  • If the dewar has been warmed up but not vented, the pressure will be approximately the partial pressure of water vapor (~20 Torr).

In any case, the pressures on both the pump and the dewar should be on the same order of magnitude before opening the dewar valve. If the dewar pressure is ~10−3 Torr, open the dewar valve only when the pump pressure is lower than ~10−3 Torr.

Warning

The process to open the dewar valve should be very slow. Keep an eye on the pressure of the vacuum line. Upon opening the dewar valve, the pressure in the vacuum line will spike. Close the dewar valve again until the pressure settles, and slowly reintroduce the pressure differential.

Note

It can take up to 24 hours to go from 10e-2 Torr to 5e-6 Torr. Be prepared to pump for one full day.

2.5 Set up the cryogenics

Once the dewar pressure is reaching 10-6 Torr, it’s time to start the cryogenics devices, to start controlling the dewar temperatures. For this, we have these devices:

  • Polycold Cryochiller

  • Cryocon 24C unit, for temperature monitoring

The Cryocon controls the temperature of:

  • CCD stage, which is reported on Channel A. The set point is 179K.

  • Cryohead which is reported on Channel B. The set point is 126K.

  • Cold plate which is reported on Channel C. The set point is 158K.

Note

An important point to note is the CCD stage must always be the warmest device - at least 3K higher than the cold plate - to avoid condensation. This is especially important when warming the dewar (as the Cryohead and Cold plate tend to warm faster than the CCD stage).

For setting the control temperature loops, the Cryocon uses Channels A (CCD Stage), B (Cryohead) and C (Cold plate). The control loop setup (for cooling down the temperatures in a controlled way) is done through the ‘’Loop’’ buttons (1 and 2).

Cryocon

Figure 9 Cryocon temperature controller display and panel. Located on the first floor in the large electronics box.

The normal setup parameters should be stored on the device. You may find an example setup screen in Fig. 10.

To set up the Cryocon, the steps are:

  • Check the above parameters (shown at the bottom of Fig. 10) for Loop 1 (CCD stage).

  • Verify that “SetPt” = 179K.

  • Check the above parameters for Loop 2 (Cold plate), with ‘’SetPt’’= 157K, and ‘’Type’’ = Manual

  • Press the ‘’Control’’ button, and verify the indicator appears blue.

In case the values are not correct, or the heater power needs to be changed, you must manually enter the values you want.

  • Press the “loop 1” button to enter the settings panel for the CCD stage.

  • Use the arrow keys to navigate to the value you want to change,

  • For example, to change Pman (the percentage of power applied to heat the element) from 15% to 1%, press the arrow keys until the # sign is next to the value.

  • Press the “SetPT” button to change the value.

    • The first time you hit the “SetPT” button, the value will change to “-“.

    • Hit “SetPT” button again to clear the field, and use the number pad to enter a decimal value.

  • Hit “Enter” to save the new value.

Cryogen settings
Cryogenic settings for loop 1

Figure 10 Nominal values for Channels A, B, and C, as well as loop 1 and loop 2 settings.

Press the “control” button to apply the settings you have applied in loops 1 and 2. Press the “home” button to go back to the home screen. There will be a power bar under Channel A or Channel B inidcating that a heater is on. A blue light next to the word “control” on the front of the panel will illuminate.

Note

You might see the blue control light turn off and you see an error “Overtemp” under the temperatures. Overtemp indicates that the controller’s Internal Temperature Monitor circuit shut off the heater. This fault is usually the result of a shorted heater or use of a heater. After the controller has been allowed to cool to an acceptable temperature, pressing the Control key will clear the error and restore control mode. See this quick-guide.

2.6 Turn on the Polycold

Before turning on the ion pump, it’s time to start chilling the instrument so you can supplement the low pressure of the ion pump with a super-cooled environment. Make sure the CCD stage is under manual heat control, and that you are applying 5-10% heat before you turn on the Polycold chiller, which is located just to the left of the large electronics cabinet. To turn it on, just press the rocker switch on the right hand side of the box.

Temperatures should start dropping quickly, but remain in the dome and watch the temperature of the CCD. It must always be 3K above the other devices, so increase the % power (amount of heat applied) if it is cooling too quickly and is close to becoming colder than the cold plate or cryohead.

In Chronograph, use the “AuxTel Temperatures and Pressures” dashboard to watch the temperatures of the instrument and watch the refrigerant supply and return pressures. The supply pressure should be about 1.8-1.9 MPa, and the return about 150-400 kPa.

Warning

If you see the cold head temperature (Channel B) drop quickly, and the return supply drops to 40K - 0 Pa, this could indicate contamination in the lines. If there is water, it is being pushed through the system and freezing quickly to the cold head, causing a blockage. Stop the chiller after a few minutes if the CCD and cold plate temperatures are not still falling. If the return pressure does not recover within a few minutes, turn off the Polycold Chiller.

After all the above steps, the temperatures should start to go down in a controlled way, until the CCD stage reach the desired setpoint (179K). It will take several hours to cool down, so this process should require an overnight stay or monitoring. When the CCD reaches the desired setpoint, change the loop control from “manual” to “PID” in the loop 1 settings. After that, the Cryocon will maintain the CCD temperature automatically.

2.7 Starting the ion pump

The dewar should have reached a pressure of about ~10−6 Torr and the CCD under loop control. At this point, you can start the ion pump. The ion pump is on the instrument mount itself, hanging upside down. To turn it on, simply flip the switch on the front of the box.

LATISS ion pump

Figure 11 LATISS ion pump.

Leave the turbopump running in case there is a pressure spike. The turbopump can help compensate for some outgassing events that will happen.

Turn on and off the ion pump several times and watch the dewar pressure burp.

When the ion pump comes on and settles into operations, there is an outgassing event. This is seen in figure 10 at 1355 UTC. Wait to close the dewar valve until this outgassing event has stabilized and the dewar and turbopump pressure reach similar values again.

Ion pump outgassing

Figure 12 Ion pump outgassing event at 1355.

The current on the ion pump is an indication of how hard it is working. In normal operations, the only LED that should be visible is the HV Bias LED. If any other LEDs are lit, the ion pump is working too hard. See figure 11.

LATISS ion pump at normal ops

Figure 13 LATISS ion pump at normal operations. HV Bias LED is lit at the bottom.

Once the ion pump is operating normally and there are no more pressure spikes, the dewar valve may be closed and the turbopump turned off.

To turn off the turbopump

  • Close the LATISS dewar valve. This will protect the dewar from the increase in pressure in the vacuum line.

  • Press the button on the front of the turbopump.

After the frequency goes down from 1500 Hz to 0 Hz, it’s possible to completely turn off the pump (flipping the back switch). Verify that the pump blades are not spinning (this could take some time, as it doesn’t have a brake).

Note

It is good practice to leave the turbopump connected to the instrument dewar just in case it is needed to pump further. Only disconnect the turbopump when you have the CCD cooled to operating temperature and the cryogenic control loops in place.

2.8 Checking the cryocon status remotely with CCS

Log in to the machine with ssh -XY <username>@auxtel-mcm.cp.lsst.org.

Type ccs-shell at the prompt.

This will put you in the CCS shell to allow running CCS commands.

ccs>set level ats 1

ccs>switchToEngineeringMode

Now you are in engineering mode and can see the CryoCon commands.

ccs>ats/ <TAB> will show the available modules, as follows:

ats/TempCryoHead
ats/periodicTasks
ats/CryoCon
ats/TempCCDSetPoint
ats/Vacuum
ats/MonitorControl
ats/TempColdPlate
ats/TempCCD ats/Pfeiffer

ccs>ats/CryoCon get <TAB> will show the available data, as follows:

getSubmittedChanges
getUnit
getMaxSetPoint
getSetPoint
getHtrRead
getPidP
getPidI
getPidD
getLoopSource
getHeaterRange
getHeaterMax
getTemp
getOtdSource
getOtdTemp
getControlType
getHeaterPower
getType

There are two control loops, so you need to enter the number of the loop. For example:

ccs>ats/CryoCon getPidP 1

will return the PidP parameter for loop 1, which should be 0.1.

ccs>ats/CryoCon getHtrRead

reads the current heater power output, which is useful to know.

ccs/>CryoCon isInControl

will tell you if the CryoCon is controlling. This is equivalent to the blue light on the front panel.

ccs>CryoCon setToControl will turn on the control if it is not controlling.

In the future, we will be able to adjust the CryoCon parameters using CCS, but this capablility is not available yet.

2.9 Power up the CCD

The full process to power up or power down the CCD is described in this technote.

3 Temporary Shutdown

In normal operations, the spectrograph should not be shut down in any way, given the CCD stage needs to be maintained at a specific temperature (and always warmer than the Cold plate). In case an electronics shutdown needs to be done for maintenance or other matters (for a short time), follow this procedure:

  • Adjust the Loops 1 (CCD stage) and 2 (Cold plate):

    • In Loop 2, reduce ‘’Pman’’ to 10%

    • In Loop 1, change ‘’Type’’ to ‘’Manual’’

    • Press ‘’System’’ -> ‘’OverTemp Configuration’’ and set the next parameters:

    • ‘’OTD Enable’’=On, ‘’OTD Source’’ = Channel A, ‘’OTD Setpoint’’ = 293K

  • Turn off the Polycold Cryochiller

    • Now, the dewar will start to warm up (as Polycold is off). The key here is to keep an eye on the CCD stage temperature, as it always has to be warmer (by at least 3K) than the Cold plate. To manage this, the parameter to be controlled is ‘’Pman’’ (it should be 15% by default).

    • If the difference between the CCD stage and the Cold plate gets close to 3K, increase ‘’Pman’’ a bit (from 15% to 16% e.g.). This will increase the CCD stage heater, and then the CCD will be warmer than the Cold plate.

    • After a while, the temperature difference will start to equalize again, so ‘’Pman’’ should be changed again (to 16.5%-17%).

    • The warming up process should be slow, so increasing Pman to higher values to accelerate the warming rate is not recommended. Pman should be around 15%-18%.

As said before, it’s important to keep monitoring all the time that CCD stage is always warmer than Cold plate (by at least 3K). After CCD stage reaches the Overtemp setpoint (293K), the Cryocon will start controlling, and it will shut itself down. The full process takes about 6 hours.

4 Complete warm up

This process overviews the process for a controlled warm up in case the instrument or telescope needs servicing. In case of a unexpected power cut (storm or large earthquake), if LATISS goes into an uncontrolled warm up, follow this procedure.

  • Power down the CCD, but leave the cryocon turned on.

  • Hook up the turbopump, but leave the instrument valve closed!

  • Start pumping on the turbopump vacuum line.

  • Pump it down until the turbopump reaches the order of 10-7 torr.

    • This takes several hours, so this process should be initiated at the beginning of the day.

  • When the turbopump reaches the approximate pressure of LATISS, turn off the ion pump.

  • Open the instrument valve SLOWLY - have the CCS monitor or chronograph open and watch the pressure inside the instrument, as well as the turbopump pressure monitor.

  • Once the instrument valve is open, go downstairs and turn off the Polycold chiller. There is a rocker switch to turn it off.

  • Then watch the pressure/temperature as it warms up. The pressure will climb pretty high, maybe even up to 10-4.

  • As it warms up, watch the temperatures and make sure the CCD isn’t the coldest thing in the instrument. This is where you need to intervene with the cryocon (see sections 2.6 and 3). Add heat to the CCD if it’s getting too cold. This is a process of trial and error.